Add MEP work to a drawing by typing

Type a change such as "add 4 receptacles and a ceiling light in each bedroom" and get it drawn on your floor plan as blocks on AIA/NCS layers, then download the DWG or DXF.

New

Edit by request drafts the change. It does not check loads or codes. Check the result before anyone builds from it.

Purpose

Add electrical, HVAC, plumbing and fire protection work to a floor plan without drawing it yourself. You say what to add and in which rooms. Aginera finds the rooms, places the symbols and draws the runs.

Who this is for

  • MEP engineers and designers who need a first layout on an architect's plan.
  • Contractors who have the plan only as a PDF and need a DWG with their work on it.
  • Small firms without a drafter to spare for revisions.

Prerequisites

  • A floor plan as a PDF (vector or scanned), DWG or DXF. Room names written on the drawing are how rooms are found.
  • A free Aginera account.

Steps

  1. Upload the plan in PDF to CAD. A PDF is converted to CAD first. On a PDF with several sheets, edits apply to the first drawing sheet.

  2. On the CAD file tab, select Edit by request.

    The CAD viewer with the Edit by request button beside Download CAD

  3. Type the change, or pick one of the examples. Name the rooms the way they are written on the drawing.

    The Edit by request dialog with a request typed

  4. Select Draw it. It takes about half a minute. The drawing comes back with the new work in red, and a list of what was drawn with counts and layers.

    The first edit: receptacles, lights and switches in red, with the count of each

  5. Ask for the next change. Each request builds on the last. Start over with this draws a request on the drawing as it was before any edit.

    A second edit on the same drawing: exhaust fans, a smoke detector, a panel and a bill of materials

  6. Switch between Changed area and Whole sheet to check the work, then select Edited DWG or DXF.

    The whole sheet with the bill of materials beside the plan and the download buttons

What you can ask for

TradeSymbolsRuns
ElectricalReceptacles (duplex, GFCI, quad, floor), switches, dimmers, occupancy sensors, ceiling, recessed, troffer, wall and emergency lights, exit signs, panels, junction boxes, disconnectsHome runs, conduit, cable tray, lighting circuits
MechanicalSupply and linear diffusers, return and exhaust grilles, exhaust fans, thermostats, VAV boxes, fan coil units, air handling units, dampersSupply, return, exhaust and outside air duct; chilled water, refrigerant and condensate pipe
PlumbingLavatories, sinks, water closets, urinals, showers, bathtubs, drinking fountains, floor drains, cleanouts, hose bibbs, water heaters, valvesCold and hot water, sanitary, vent, storm and gas pipe
Fire and low voltageSmoke and heat detectors, pull stations, horn strobes, fire alarm panel, sprinkler heads, extinguishers, data and telephone outlets, access points, cameras, card readersSprinkler pipe, fire alarm circuits, data cable

You can also ask for tags and numbering (EF-1, EF-2), notes, a bill of materials, a legend, and cleanup of existing work: erase a block or a layer, move work to another layer, rename a layer, or swap one block for another.

Everyday words work. "Wall outlet" draws a duplex receptacle, "air vent" a supply diffuser, "bathroom fan" an exhaust fan, "breaker panel" a panelboard.

Example requests

  • Add 4 duplex receptacles and a ceiling light with a switch in each bedroom
  • Put a supply diffuser in every office and run a supply duct from the AHU, 300x200
  • Add an exhaust fan in each toilet, tagged EF-1, EF-2, and a bill of materials
  • Add a panel LP-1 in the lobby and a home run from the bedroom receptacles to LP-1
  • Move everything on layer E-LITE to E-LITE-FIXT

Expected result

  • New work drawn as blocks on AIA/NCS layers, for example E-POWR-DEVC, E-LITE-FIXT, M-HVAC-SDFF, M-DUCT-SUPP, P-SANR-PIPE, F-ALRM-DEVC.
  • A list of what was drawn, what was assumed, and what needs checking.
  • A DWG (AutoCAD 2018) or DXF with the original drawing and every edit.

What it does not do

  • Load, voltage-drop, hydraulic or code calculations.
  • Dimensions, hatching, revision clouds or title block edits.
  • Revit files or 3D.
  • Clash checks. Runs are drawn at right angles between the points they connect.

Troubleshooting

What you seeWhat to do
"Which room should … go in?"The room you named is not written on the drawing. Use a name from the list shown, exactly as it appears.
A note that a space "may take in the neighbouring space"The room is narrow or open to the one beside it. Check where the work landed, and ask again naming a smaller room if it is wrong.
Work drawn near a label, not along the wallsNo closed outline was found around that label. Scanned plans with broken lines do this. Try a cleaner copy of the plan.
"You have used today's free edit requests"Free accounts have a daily number of requests. Buying the drawing's CAD file removes the limit for that drawing.

The dialog asking which room was meant, with the room names found on the drawing

What is free and what is paid

Free with an accountWith the drawing's CAD purchase
Convert the PDF and view it as CADYes
Ask for a change and see it drawnA daily number of requestsWithout the daily limit